Education

Call 01604 756637 for FREE expert advice or fill in the form below and we will be in touch.

Education Projects

Education Projects


University of Nottingham
Electrical University

Designed by the prestigious Architects MAKE this £615m complex will provide Nottingham University students with a new improved education experience, which will attract both national and international students incorporating a light, vibrant environment with student focused spaces. SEC Electrical's largest project yet.


Project Value: £1,100,000

Main Contractor: Kier Construction

Services Included; Sub Distribution, Photovoltaic System, General & Emergency Lighting, Small Power, Telecoms, Facilities For Disabled, TV/DAB/FM, Access Control, Structured Cabling System, Security Alarms, CCTV, Fire Alarm, Mechanical Supplies, Lightning Protection

Kings College, Brighton
College Electrical

A city centre project, with all the usual demands of such a location, logistics, general public and limited access. SEC Electrical were able to manage these extremes well and delivered an excellent new facility for international students to learn and study in a beautiful modern environment. King's College has been purpose-built to provide cutting-edge facilities in an iconic building constructed to exact environmental standards.

Project Value: £420,000


Main Contractor: Buckingham Group


Services Included; LV Distribution, Photovoltaic System, Small Power, General & Emergency Lighting, Lighting Controls, Class Change System, Facilities For Disabled, TV/DAB/FM, Data Network, Video Entry System, Paxton Access Control System, Intruder Alarm, CCTV, Fire Alarm, Mechanical Supplies, Lightning Protection

Heath Mount School - Classroom Extension & Auditorium
Heath Mount School

Established in 1796, this beautiful mansion is set in the glorious Woodhall Park Estate and is one of the oldest 'prep' schools within the the UK. SEC's ability to work on a Grade 1 building is recognition of the long established history and their commitment to excellence.


Project Value: £270,000


Main Contractor: ASHE Construction


Services Included; LV Distribution, Small Power, Mechanical Supplies, General and Emergency Lighting, Lighting Controls, Stage Lighting, Fire Alarm, Bell and Warning System, Sound and AV System, Data Network, Intruder Alarm, Access Control, Lightning Protection

John Henry Newman School - Performing Arts Block

John Henry Newman Electrical School

John Henry Newman are among 277 schools across the country which have been chosen for the second phase of the Priority School Building Programme. The £3.7million project was spent on a sports and performing arts block.


Project Value: £310,000


Main Contractor: ASHE Construction


Services Included; Sub Distribution, Distribution boards, General Power, General Lighting, Lighting Controls, Mechanical Supplies, Fire Alarm, Data Installation, CCTV, Facilities for the Disabled, Photovoltaic Installation, Lightning Protection, TV/ FM Aerial Installation, Telecommunications, Intruder Alarm

Bowerdean Nursery, High Wycombe
Bowerdean Nursery Electrical Installation

A new single storey building enabling children to learn through 'play' creating a memorable meaningful experience.


Project Value: £80,000


Main Contractor: Edgar Taylor


Services Included; Mains Distribution, Small Power, Internal and Emergency Lighting, External Lighting, Voice and Data, Fire Alarm, Door Release System, Access Control, Lightning Protection, Facilities for the Disabled, Intruder Alarm

Lace Hill Academy, Milton Keynes
Lace Hill Acadedmy Milton Keynes

This project was designed to provide a mixed use of educational facilities, community use and leisure facilities, as well as associated infrastructure, amenity and landscaped areas to serve the immediate residential development. The aim of this design was to provide a purpose built which ‘fits in’ within the local environment and is beneficial to the wider community. SEC Electrical are proud to have worked on such a prestigious development.


Project Value: £248,000


Main Contractor: Buckingham Group


Services Included; Mains Distribution, Small Power, Internal, External & Emergency Lighting, Voice & Data, Fire Alarm, TV, Door Access, Lightning Protection, Induction loop, Intruder Alarm.

Pitsford Junior School, Duckworth Building, Northampton
Pitsford Junior, Northampton

Duckworth Building. Named after the motoring engineer Keith Duckworth found-er of Cosworth Engineering. Co-incidentally SEC Electrical now occupy the original research / design offices next door to the existing Cosworth buildings in St James, where Keith Duckworth designed and built the ‘Double four valve engine’ used exclusively today in F1.


Project Value: £250,000


Main Contractor: Winvic Construction

Woodlands Secondary School, Luton
Woodlands Secondary School

This £3.5million extension to the Woodlands Secondary School in Luton will accommodate students with various learning difficulties, the future education department, administration offices and a new staff room. In a bid to build schools for the future, The Woodlands Secondary School has undergone a radical transformation. The aim of the expansion is to address the much needed school places in the town.


Project Value: £340,000


Main Contractor: Watson & Cox


Services Included; Mains & Sub mains Distribution, Containment, Internal, External & Emergency Lighting, Small Power, Mechanical Supplies, Fire Alarm, Intruder Alarm , Access Control, Voice & Data, Facilities for the Disabled, Induction Loop, Lightning Protection

RECENT PROJECTS